Tile in baths
|
Bathroom fixture |
Granite countertops
|
Fan in Family Room
|
June 3, Grading
|
Drive
|
Neighborhood
|
Ready for seeding
|
June 6, Indoor plumbing
|
Cabinets
|
Fridge recess |
Carpets are in
|
Calm before the storm
|
Mirror, mirror, on the wall
|
Bedroom carpets
|
So you can tell the baths apart, a square mirror
|
The deck is still to come, but move-in day was June 9
|
Nice clean sink
|
9:38 a.m. July 3: Assembly of the Play Set starts
|
Get this stuff outta my box!
|
9:44 a.m. all the wood is lined up
|
10:53 a.m. the base is set up
|
1:28 p.m. plumb and level
|
2:17 p.m. have walls
|
4:34 p.m. roof, slide, rock wall, and stairs
|
6:46 p.m. the swings attached (hardest part was the trench to level it)
|
Finished except for picnic table and grading
|
July 4th: The finished insides
|
Family Room
|
Dining Room
|