Structure, but no glass
|
It survived the nor'easter
|
December sequence ...
|
... with glass ...
|
... in the roof ...
|
... and Tyvek vapor barrier
|
Fully enclosed
|
Ready for electric
|
Replacing the slider ...
|
French doors were a little bit bigger
|
Clapboards on
|
No decking yet
|
Lookin' pretty
|
A real sunroom outside
|
Electrical in, pipes on the floor
|
Radiant heat has two loops, each with own return
|
Decking on
|
Staging gone
|
Another sequence ...
|
... December 17
|
A new angle
|
Berin covering the floor with a base for the tile
|
Two radiant loops start and end at the threshold
|
Completed base and sheetrock in
|
Ready for marble
|
Edges go in first
|
Then the center squares
|
Marble reflections
|
Jimmy did the railing and catwalk deck
|
Christmas Eve
|